STEP 01 OF 08 PROJECT DEFINITION

What are you planning to build?

Select the primary use-case and vehicle archetype for your charging asset. This configures the demand models, electrical load profiles, and traffic dwell time calculations.

Public EV Charging Station Standalone urban multi-gun charging station catering to daily commuters and cabs.
Highway Charging Hub High-power transit hub on national expressways with passenger amenities.
Fleet Charging Station Dedicated depot for commercial delivery fleets, e-rickshaws, and logistics vans.
Commercial / Mall Hub Co-located at shopping centers, dining precincts, and entertainment hubs.
Petrol Pump + EV Charging Retrofitting high-speed DC chargers onto an existing retail fuel station forecourt.
Workplace / Tech Park Long dwell-time smart AC and fast DC charging for corporate campus employees.
Residential Complex Gated community and high-rise apartment charging with shared metering.
βœ“
2-Wheelers
e-Bikes & Scooters
βœ“
3-Wheelers
e-Rickshaw / e-Autos
βœ“
4-Wheelers
Cars & Electric SUVs
βœ“
Commercial / Fleet
Delivery Vans & Buses
Small Scale 2 to 4 charging guns (30 kW – 60 kW total load)
Medium Scale 4 to 8 charging guns (120 kW – 240 kW total load)
Large Flagship Hub 8+ fast DC dispensers (360 kW – 500+ kW capacity)
STEP 02 OF 08 GEOSPATIAL ANCHOR

Where is the proposed location?

Search for an address, click/drag anywhere on the live map preview, or pick from popular benchmark corridors.

Quick Presets:

Defines the demographic catchment, VAHAN vehicle population, and competitor audit boundary.

β€’ Click map or drag orange pin to re-center LIVE OSM / CARTO TILES
STEP 03 OF 08 SITE CHARACTERISTICS

Where are you installing the station?

Property classification determines civil engineering costs, transformer setback requirements, right-of-way permissions, and operational dwell time.

Petrol Pump Forecourt Co-located at an active fuel station.
Highway Roadside Site Adjoining national / state highway corridor.
Commercial IT / Office Park Corporate campus with regular office dwell.
Shopping Mall / Retail High footfall mall parking lot.
Standalone Private Land Undeveloped open commercial plot.
Residential Society Apartment complex parking bay.
STEP 04 OF 08 USER DEMAND WEIGHTING

Who are the primary EV drivers at this location?

Refine the user demographic mix to calibrate connector speeds, billing software workflows, and peak utilization cycles.

Passenger 4-Wheelers 45% Weight

Personal electric cars (Tata Nexon, Mahindra XUV400, MG ZS EV, Hyundai Ioniq). Expect 30–60kW DC CCS2 charging with average dwell of 35–50 minutes.

HIGH REVENUE / kWh
2-Wheelers & LEVs 35% Weight

e-Scooters (Ola, Ather, TVS iQube, Bajaj Chetak). Requires high-density multi-port 3.3kW AC or fast DC Type-6 LEV plugs.

HIGH TRANSACTION VOLUME
Commercial & Fleets 20% Weight

Ride-hail cabs (BluSmart, Uber Green) and last-mile logistics (Tata Ace EV). Demands rapid turnaround and bulk corporate billing.

HIGH UTILIZATION
STEP 05 OF 08 EVSE HARDWARE MIX

Select your charging equipment configuration

You can either let EVision compute the optimal charger mix based on demand and grid headroom, or manually customize specific dispenser counts.

2-Wheeler LEV Chargers
3.3kW AC Multi-socket point
2
4-Wheeler AC Type-2
7.4kW / 11kW / 22kW Smart AC
2
4W DC Fast (Dual Gun)
30kW – 60kW CCS2 Fast DC
2
High-Power DC Dispenser
120kW – 240kW Ultra-Fast CCS2
1
STEP 06 OF 08 CAPITAL BUDGET

What is your planned investment budget?

CapEx spans EVSE hardware, dedicated transformer installation, civil canopies, Discom sanction deposits, and cloud management software.

Under β‚Ή10 Lakhs Ideal for small AC hubs or single 30kW DC fast charger setup.
β‚Ή10 – β‚Ή25 Lakhs Standard single 60kW DC dual-gun dispenser with LT connection.
β‚Ή25 – β‚Ή50 Lakhs Multi-gun fast DC setup (60kW + 30kW) with dedicated transformer.
β‚Ή50 Lakhs – β‚Ή1 Crore High-power highway hub (120kW+ DC) with customer canopy.
β‚Ή1 Crore + Flagship mega-hub with solar canopy, BESS storage, and 8+ guns.
Not Decided Let EVision estimate the minimum viable CapEx for this site.
STEP 07 OF 08 ELECTRICAL INFRASTRUCTURE

What electrical charging capacity do you require?

This checks if the local 11kV/33kV power grid substation has sufficient headroom to sanction your commercial EV power load without delay.

30 – 60 kW Load LT Connection β€’ No new transformer typically required.
120 – 240 kW Load 11kV HT Connection β€’ Requires dedicated 250 kVA transformer.
360 – 500+ kW Load 11kV/33kV Express Feeder β€’ 500 kVA+ dedicated transformer.
Auto / Custom Match automatically to recommended charger configuration.
Why this matters for your site

State DISCOMs require high-speed DC stations (>100 kW) to connect via 11 kV HT lines. EVision queries the nearest substation to ensure spare capacity exists, preventing unexpected β‚Ή15L+ line extension costs.

STEP 08 OF 08 READY FOR SYNTHESIS

Review your site planner inputs

Verify your project blueprint before initiating the geospatial demand modeling, grid audit, and financial sensitivity engine.

Synthesizing EVision Site Analysis...

Querying VAHAN vehicle registry, MoRTH traffic telematics, and CEA grid substation headroom databases.

FEASIBILITY REPORT VERIFIED DATASET

Selected Site Location

LAT: 18.8242Β° N, LNG: 73.2845Β° E β€’ ANALYSIS CATCHMENT: 5 KM RADIUS β€’ ASSESSMENT ID: EVI-849201
Landing Page
Site Feasibility Score
A+ EXCELLENT
91
OVERALL INDEX / 100

High Potential Charging Site

Calculated across 6 foundational pillars including local EV catchment density, grid substation headroom, road exposure, and competitor charging deficits.

Local EV Demand & Catchment
VAHAN 2024
Catchment Population
360,000
[CENSUS 2021 / GEO 2024]
Registered EVs
17,280
[VAHAN RTO AUDIT]
EV Penetration Rate
4.8%
[TOTAL VEHICLE SHARE]
YoY Adoption Growth
+44.5%
[STATE VAHAN GROWTH]
Registered EV Population Breakdown by Class
AI Spatial Strategy Brief & Location Rationale
AI ENGINE: ACTIVE

Synthesized from your uploaded session parameters (Selected Site Location) and live spatial dataset telemetry.

πŸ’‘ WHY THIS LOCATION?

Analyzing site location spatial advantage and grid headroom...

πŸ‘₯ TARGET PERSONAS & DEMAND

Evaluating 4W passenger commuters and commercial fleet mix...

⏱️ 90-DAY PHASED EXECUTION

Calculating DISCOM 11kV sanction & civil commissioning timeline...

🎯 COMPETITIVE MOAT & TARIFF

Formulating tariff strategy and amenity co-location advantage...

πŸ›οΈ Future Government Masterplans & Commercial Infrastructure Radar
LIVE GAZETTE RADAR β€’ MoRTH / STATE MASTERPLAN

Synthesized from state urban development gazettes, MoRTH highway masterplans, upcoming commercial megamalls, and AI news feeds for Selected Site Location:

newspaper
OFFICIAL GAZETTE & INFRASTRUCTURE NEWS BULLETIN

Fetching latest government infrastructure notifications and commercial retail development permits...

TRANSIT HIGHWAY OASIS

Petrol Pump Integrated Dual-Speed EV Hub

OPTIMAL ROI PROFILE

Deploying high-speed dual-gun DC chargers alongside customer amenities captures captive intercity passenger and fleet charging demand with minimal civil lead time.

Traffic & Mobility
VERY HIGH EXPOSURE
Daily Passing Traffic
38,500 vehicles/day
[MoRTH HIGHWAY CENSUS 2024]
  • Road Classification: National Highway / 6-Lane Expressway
  • Peak Charging Windows: 08:00–11:30 & 16:30–21:30
  • Site Ingress: Excellent β€” Dedicated slip lane with zero curb obstruction
Grid & Substation Audit
SUITABLE
Nearest 11kV Substation
110/33/11 kV MahaVitaran Substation
[CEA NATIONAL SUBSTATION REGISTRY]
  • Distance from Property: 0.9 km
  • Available Grid Headroom: 650 kVA Spare Capacity
  • Discom Sanction Timeline: Fast-Tracked within 21 Days
  • Feeder Status: Dedicated 11kV line runs within 180m
Competition & Gap Read
SUPPLY OPPORTUNITY

Moderate competition with high unmet demand for reliable 60kW+ DC fast charging. Nearby stations report 25-40 min wait times during evening peaks.

EVision Opportunity Read
Low high-power DC availability in a 5km radius makes this an ideal first-mover transit fast-charging opportunity.
Existing Charging Infrastructure within Catchment Radius
[OPEN CHARGE MAP & REGULATORY FILINGS 2024]
Station & Operator Distance Charger Equipment Average Utilization Competitive Vulnerability / Opportunity
CapEx Investment Breakdown
[MODELED ESTIMATE]
Estimated Total Project CapEx
β‚Ή38.5 – β‚Ή44.2 Lakhs
TURNKEY ESTIMATE
Live Financial ROI Simulator
INTERACTIVE SENSITIVITY
Electricity Purchase Tariff β‚Ή6.80 / kWh
Retail Selling Price to Driver β‚Ή18.50 / kWh
Expected Utilization Rate 28% Capacity
Operating Days / Month 30 Days
Daily Dispensed Power
1,613 kWh
Monthly Gross Revenue
β‚Ή8.95L
Estimated Monthly Profit
β‚Ή4.78L
Annual ROI
38%
Estimated Payback Period: 22 Mo (1.8 Yrs)
Interactive Geospatial Site Analysis & Sub-Location Recommendation Engine
[LEAFLET GEOSPATIAL ENGINE]
Layer Controls:
Candidate Sub-Locations within Catchment (ROI-Ranked)

High-yield candidate spots within your analyzed perimeter evaluated for capital efficiency, footfall capture, and local real estate cost.

Sort by:
3D SPATIAL DIGITAL TWIN LIVE THREE.JS STUDIO

3D Vision Facility Blueprint Studio

Interact with the 2D CAD drafting grid and photorealistic 3D Three.js environment configured specifically for your project layout.

Launch 3D Vision Studio (New Tab β†—)
COST REDUCTION BLUEPRINT UP TO β‚Ή8.5L CAPEX SAVINGS
Smart Cost-Cutting & Capital Optimization Strategies

Actionable engineering & policy levers to minimize initial equipment CapEx, lower monthly DISCOM power bills, and shorten ROI payback.

Potential CapEx Reduction
β‚Ή3.50L – β‚Ή8.50L
PM E-DRIVE Subsidy & IT Sec 32 Tax Write-off
Monthly OpEx Reduction
28% – 35% Lower
30kW Solar Net-Metering & Night TOD Tariff
Accelerated Payback
4.5 Months Faster
Reduced Capital Recovery Horizon
01 β€’ GOVT SUBSIDY & IT DEPRECIATION SAVE β‚Ή3.5L – β‚Ή5.0L

PM E-DRIVE Capital Subsidy & 100% Depreciation

Claim state EV policy capital subsidies on Fast DC equipment plus 100% Accelerated Depreciation under Income Tax Section 32 in Year 1, effectively cutting net hardware investment by 22–30%.

02 β€’ ROOFTOP SOLAR PV INTEGRATION SAVE 28–35% OPEX

30kW Canopy Solar Net-Metering

Co-locate a 30kW rooftop solar array over charging bay canopies. Solar generation reduces daytime grid power consumption from β‚Ή6.80/kWh down to ~β‚Ή2.10/kWh net-metered cost.

03 β€’ DYNAMIC LOAD MANAGEMENT (DLM) AVOID β‚Ή4.0L GRID COST

Smart Peak Shaving & Load Sharing

Implement OCPP 1.6J Smart Dynamic Load Sharing across chargers. This eliminates the need to pay expensive DISCOM 250kVA transformer upgrade fees, staying safely within 100kVA headroom.

04 β€’ CO-LOCATION LAND SHARING SAVE β‚Ή1.5L CIVIL

Petrol Pump / Mall Asset-Light Lease

Co-locate with existing commercial properties or petrol pumps on revenue-share lease models. Share existing civil paving, lighting, 24/7 security, and amenities to minimize civil CapEx.

EXECUTIVE INVESTMENT VERDICT RECOMMENDED SITE

Recommended for Immediate Development β€” Petrol Pump Integrated Dual-Speed EV Hub

CapEx Envelope
β‚Ή38.5 – β‚Ή44.2 Lakhs
Modeled Payback
1.8 Years (22 Months)
Projected Net Profit
β‚Ή4.78 Lakhs / mo
Est. Land / Rent Cost
β‚Ή65–80 / sq.ft. / mo MODELED ESTIMATE
Core Investment Advantages
Key Risks & Mitigation Factors
Ready to proceed with Discom electrical filings, equipment optimization, and AI research?
Research this Site with AI β†’